A statutory board under the Ministry of Sustainability and the Environment (MSE)
Detailed design of the flood barrier system
PUB is a statutory board under the Ministry of Sustainability and the Environment (MSE). It is the national water agency, which manages Singapore’s water supply, water catchment, and used water in an integrated way.
April 2023
Property Flood Resilience Scheme
Complete end-to-end management of the PFR Scheme covering Survey, Detailed Design, Manufacture, Installation, Commissioning and Handover.
Lakeside have increased the flood resilience to 22no. properties as part of the scheme, providing end-to-end support for Homeowners and guidance through the grant funding process.
March 2022 – June 2023
Lakeside selected to protect 15no. BT utility sites nationwide.
The bespoke defences required include:
Lakeside has been appointed as a sub-contractor to MJ Quinn to carry out the design, supply and installation of flood defences to 15no. BT utility sites nationwide.
Each site has bespoke protection requirements and, subsequently, bespoke design and manufacture demands.
March – December 2022
Property Flood Resilience (PFR) Flood Grant Scheme
Flood defences covered all potential points of water ingress, including Door & Opening Defence, Brick Defence, Sewage Defence and Wall Defence.
Lakeside were selected as the Main Installation Contractor by the council, installing flood defences to 40no. properties in total as part of the PFR Flood Grant. Working closely with AECOM as the Managing Agent and the Council as the end Client, the Project Team provided end-to-end support for Homeowners to provide guidance through the grant funding process, from survey to installation, training and maintenance.
September 2020 – October 2022
Flood Grant Scheme
Complete end-to-end management of the PFR Scheme for Essex Council, covering Flood Risk Surveys, Product Selection, Survey, Design & Manufacture, Installation, Demonstration and Maintenance.
Lakeside has been appointed as the Flood Protection Specialist to deliver the grant scheme on behalf of the Council since 2018. The scheme pays for the installation of flood protection products to homes such as Flood Doors, Flood Barriers and Anti-flood Air Bricks.
October 2018 – March 2022
Property Flood Resilience
Door & Opening Defence, Brick Defence, Sewage Defence, Wall Defence.
Manual measures, such as Flood Barriers, and passive measures, such as Flood Doors.
In November 2019, South Yorkshire and its surrounding counties were hit by severe flooding after a month’s worth of rain fell in one day, resulting in over 800 properties being flooded. We provided end-to-end support for Homeowners to provide guidance through the grant funding process, from survey to installation, training and maintenance.
November 2020 – June 2021
Lakeside Demountable Aluminium Flood Barriers;
Lakeside Slimline Demountable Aluminium Flood Barriers
Flood Barrier Accessories
The barriers have been utilised in the last flood.
On the 20th February 2022 the water reached 450mm above finished floor level and the building remained dry and operational
February 2022.
Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.
Rapid turnaround with surveys conducted within one working week from enquiry, extensive stakeholder management between Consultant, Client & Tenants.
September 2017.
Retirement Living Development, Harbour Road, Gosport, Hampshire UK
2 Lakeside Demountable Aluminium Flood Barriers, 1800mm H.
CAD drawings; project meeting attendance from design phase; product samples and technical advice.
September 2017.
Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.
Large scale installation with 34no. Flood Barriers, dye test to drains, bespoke sealed manhole covers.
September 2017.
9 Lakeside Demountable Aluminium Flood Barriers, 300 – 900mm H.
Bespoke cover plates; storage racks with accompanying Installation Reminder Sign.
August 2017.
Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1200mm H.
Bespoke steel ramps to car park openings, required
due to high frequency of vehicle traffic, Demountable system allowing adjustable height, Lockable top pressing clamps, ensuring barriers can be locked into place once system is deployed and more…
January 2017.
Fremlin Walk Shopping Centre, Maidstone, Kent UK
Lakeside Demountable aluminium Flood Barriers, 900mm and 1200mm H.
Daily, efficient project management due to large scale of the project in bad weather conditions; bespoke steel ramps to car park openings due to traffic frequency and colour-coded stock itemisation.
January 2017.
Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1500mm H.
Vertical wall-mounted storage units, Concealment of side
posts within cladding, Joint inter-company working with both Architect and Main Contractor
December 2016.
ACE Sandbanks 17-21 Banks Road, Sandbanks UK
5 Lakeside Demountable aluminium Flood Barriers, between 900mm and 1500mm H.
CAD drawings; project meeting attendance from design phase; product samples and technical advice.
December 2016.
Lakeside Demountable aluminium Flood Barriers, 900mm H.
High agility and efficiency for installation in conditions of rising flood water.
December 2016.
Lakeside Demountable Aluminium Flood Barriers, 600mm and 900mm H.
Bespoke L-shape perimeter barrier.
December 2016.
Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence Measures.
Extensive storage racking facilities, staff training support.
December 2016.
Lakeside Demountable aluminium Flood Barriers, 600mm H; Vent Covers.
Bespoke perimeter barrier system and bespoke vent cover.
October 2016.
PWP Architects/Soho House, Confidential Client UK
Various 1.5m H and 900mm H barriers.
Initial site meeting and survey, product demonstration, bespoke ground works, bespoke pressing clamps and bespoke lockable cover plates for side posts.
January 2016.
2 Lakeside Demountable aluminium Flood Barriers, 2400mm H.
Project meeting attendance; product demonstration and bespoke ground works.
July 2015.