Commercial & Industrial Flood Defence Solutions
We offer complete flood defence solutions to protect businesses and industrial units against all potential routes of water ingress.
We offer a suite of holistic flood protection measures to ensure optimal flood protection and risk mitigation to your business.
Standard measures of flood protection include flood barriers to door and roller shutter openings, sewage defence and wall defence measures.
We have significant experience in end-to-end management and delivery of holistic flood protection solutions to entire industrial parks and business units.
Most popular flood defence products for businesses
-
Demountable Flood Barriers
-
Temporary Flood Barriers
-
Stainless Steel Flood Gates
-
Steel Flood Doors (SR2 Rated)
-
Sewage Defence
Related Case Studies
-
Sowerby Bridge Business Park
Requirements
Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.
Bespoke project features
Large scale installation with 34no. Flood Barriers, dye test to drains, bespoke sealed manhole covers.
Installation date
September 2017.
-
Bath Rugby
Requirements
Lakeside Demountable Aluminium Flood Barriers, 600mm and 900mm H.
Bespoke project features
Bespoke L-shape perimeter barrier.
Installation date
December 2016.
-
Fremlin Walk, Maidstone Kent
Requirements
Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1200mm H.
Bespoke project features
Bespoke steel ramps to car park openings, required
due to high frequency of vehicle traffic, Demountable system allowing adjustable height, Lockable top pressing clamps, ensuring barriers can be locked into place once system is deployed and more…Installation date
January 2017.
-
Ford, Hamton Environmental Services
Requirements
Lakeside Demountable aluminium Flood Barriers, 900mm H.
Bespoke project features
High agility and efficiency for installation in conditions of rising flood water.
Installation date
December 2016.
-
Kendal Business Park, Kendal
Requirements
Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.
Bespoke project features
Rapid turnaround with surveys conducted within one working week from enquiry, extensive stakeholder management between Consultant, Client & Tenants.
Installation date
September 2017.
-
Sowerby Bridge Industrial Units, Calderdale
Requirements
Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence Measures.
Bespoke project features
Extensive storage racking facilities, staff training support.
Installation date
December 2016.
View all Case Studies