Commercial & Industrial Flood Defence Solutions

We offer complete flood defence solutions to protect businesses and industrial units against all potential routes of water ingress.

We offer a suite of holistic flood protection measures to ensure optimal flood protection and risk mitigation to your business.

Standard measures of flood protection include flood barriers to door and roller shutter openings, sewage defence and wall defence measures.

We have significant experience in end-to-end management and delivery of holistic flood protection solutions to entire industrial parks and business units.

Related Case Studies

  • Sowerby Bridge Business Park

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.

    Bespoke project features

    Large scale installation with 34no. Flood Barriers, dye test to drains, bespoke sealed manhole covers.

    Installation date

    September 2017.

  • Bath Rugby

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, 600mm and 900mm H.

    Bespoke project features

    Bespoke L-shape perimeter barrier.

    Installation date

    December 2016.

     

  • Fremlin Walk, Maidstone Kent

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1200mm H.

    Bespoke project features

    Bespoke steel ramps to car park openings, required
    due to high frequency of vehicle traffic, Demountable system allowing adjustable height, Lockable top pressing clamps, ensuring barriers can be locked into place once system is deployed and more…

    Installation date

    January 2017.

  • Ford, Hamton Environmental Services

    Requirements

    Lakeside Demountable aluminium Flood Barriers, 900mm H.

    Bespoke project features

    High agility and efficiency for installation in conditions of rising flood water.

    Installation date

    December 2016.

     

  • Kendal Business Park, Kendal

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.

    Bespoke project features

    Rapid turnaround with surveys conducted within one working week from enquiry, extensive stakeholder management between Consultant, Client & Tenants.

    Installation date

    September 2017.

  • Sowerby Bridge Industrial Units, Calderdale

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence Measures.

    Bespoke project features

    Extensive storage racking facilities, staff training support.

    Installation date

    December 2016.


View all Case Studies